V5570/5571 – line modernization (110 kV)
Activity:
replacement of some masts, replacement of insulator hangers, phase conductors and grounding cable.
Management operator: EG.D
Voltage level: 2x110 kV
Length: 15,3 km
Below is a short list of successfully completed projects as an example of our work.
Activity:
replacement of some masts, replacement of insulator hangers, phase conductors and grounding cable.
Management operator: EG.D
Voltage level: 2x110 kV
Length: 15,3 km
Activity:
assembly and construction of new masts (389 t), pulling of all wires.
Management operator: TenneT / DB
Voltage level: 2x380kV + 2x110 kV
Length: 2,2 km
Activity:
repair of concrete headers, blasting and painting of steel structures, replacement of insulator hangers, phase conductors and grounding cable.
Management operator: EG.D
Voltage level: 2x110 kV
Length: 43 km (187 p.b.)
Activity:
dismantling of existing lines, installation and construction of new poles, installation of phase conductors and a combined grounding cable.
Management operator: WEMAG Netz
Voltage level: 2x110 kV
Length: 10,37 km (40 p.b.)
Activity:
dismantling of existing lines, installation and construction of new poles, installation of phase conductors and a combined grounding cable.
Management operator: ČEPS
Voltage level: 2x400 kV
Length: 3,3 km
Activity:
assembly and construction of masts – 2,290 tons of steel structures.
Management operator: Amprion
Voltage level: 2x380kV + 2x110 kV
Activity:
complete construction of a new double line from excavation to pulling all wires.
Management operator: EG.D
Voltage level: 2x110 kV
Length: 4,7 km (23 p.b.)
Activity:
replacement of phase conductors of single line (25 km) and double line (2 km), replacement of insulator hangers.
Management operator: EG.D
Voltage level: 1x110 a 2x110 kV
Length: 27 km (110 p.b.)
Activity:
complete construction of a new line from excavation to pulling all wires.
Management operator: ČEPS
Voltage level: 1x400 kV
Length: 16,6 km (51 p.b.)
Activity:
repair of concrete headers, installation and raising of steel structures, replacement of insulator hangers and phase conductors.
Management operator: EG.D
Voltage level: 2x110 kV
Length: 26,6 km (121 p.b.)
Activity:
dismantling of existing lines, installation and construction of new poles, installation of phase conductors and a combined grounding cable.
Management operator: EG.D
Voltage level: 1x110 kV
Length: 19,0 km
Activity:
project documentation for the implementation of the construction of the line modernization, consisting mainly of the replacement of phase conductors and insulator hangers on the TR Šumperk - TR Hanušovice line.
Voltage level: 2x110 kV
Length: 18,7 km
Activity:
project documentation for the implementation of the construction of the line modernization - i.e. raising 75 PORTAL type masts and replacing 173 supporting insulator hangers.
Voltage level: 1x400 kV
Length: 85,8 km
Activity:
project documentation for zoning decisions, for building permits and for the construction of a loop from the 2x400 kV line to the new TR MIL. The project also included the design of a new series of branch mast structures of the MERCEDES type.
Voltage level: 2x400 kV
Length: 1,1 km
Activity:
project documentation for joint construction permit for complete replacement of 1x400 kV line with new double line in TR Hradec - TR Chrást line.
Voltage level: 2x400 kV
Length: 82,5 km
Activity:
project documentation for the zoning decision to replace part of the 2x110 kV line and part of the 2x35 kV line with a new combined 2x110 kV + 2x35 kV line in the TR Česká Lípa - TR Nový Bor line.
Voltage level: 2x110 kV + 2x35 kV
Length: 14,2 km
Activity:
territorial-technical study and documents for the EIA process of construction of a new interstate overhead line between TR Otrokovice and the Slovak Republic on a completely new route.
Voltage level: 2x400 kV
Length: 61,8 km
Activity:
project documentation for demolition work, including securing a permit to remove the building.
Voltage level: 1x220 kV
Length: 66,5 km
Activity:
project documentation for the assignment of the action of replacing two 2x220 kV lines with a new 2x400 kV line on the TR Vernéřov – TR Vítkov – TR Přeštice line.
Voltage level: 2x400 kV
Length: 165,9 km
Activity:
project documentation for the implementation of the construction incl. legislative permit for the complete replacement of the V306/307/308 TR Řeporyje – TR Chýně – TR Tuchlovice line in the original route. The project also included the design of a new series of narrow SOUDEK mast structures for conductor 679-AL1/86-ST1A.
Voltage level: 2x110 kV
Length: 29,9 km
Activity:
project documentation for the construction of the replacement of the upper part of the steel structure of the PORTAL type masts with a steel structure with an openwork bridge, new sets of connection of grounding cables and insulator hangers.
Voltage level: 1x220 kV
Length: 134,1 km
Activity:
project documentation for zoning decisions, building permits and for the construction of the replacement of the 1x400 kV line with a new combined line 1x400 + 2x110 kV. The project also included the design of a new series of mast structures of the combined DUNAJ type.
Voltage level: 1x400kV + 2x110 kV
Length: 15,2 km